Home Skip to main content

Research Reports
Filter by Keyword

11 report(s) found with precast concrete in the keywords field
1 - 10 of 11 1 2 Next Page
   

A new method for building seismically resilient bridges is proposed using accelerated bridge construction (ABC) methods. The hybrid two-column bridge bent consists of post-tensioned precast concrete columns with a buckling restrained brace (BRB) as an external energy dissipation device. The design of...

 

The use of precast concrete in bridge construction has been abundant in recent years because of its efficiency and superior quality control. Precast components are connected at the bridge site to reduce construction time and traffic disturbance. The Grouted Splice Sleeve (GSS) connection provides good...

 

A mechanical bar splice, also known as bar coupler, is an alternative to the traditional lap splicing to connect bars in reinforced concrete (RC) structures. Even though mechanical bar splices can be used as new precast column connections to accelerate bridge construction (ABC), the use of bar couplers...

 

Precast concrete construction has been proven to be very efficient in bridge engineering, especially in accelerated bridge construction (ABC), where precast concrete components are connected to save time and minimize disruption of traffic. Post-tensioned (PT) concrete structural elements, when combined...

 

A study was conducted to develop recommendations for short span concrete structure type selection based on analyses of existing structure costs and performance data from South Dakota roadway systems. Through a combination of data sources, including the PONTIS database, local owner and inspector surveys...

 

The most common type of bridge on South Dakota local roads is a precast prestressed double-tee (DT) girder bridge. More than 700 DT bridges are currently in-service in South Dakota. Structural detailing, aging, traffic volume, and environmental conditions affect structural performance, integrity, and...

 

The South Dakota Department of Transportation (SDDOT) allows the use of precast double-tee bridges in counties because they are economical and fast in construction. Alternative durable prefabricated bridge systems are needed to provide more options to local governments. The present study was carried...

 

For this research, sensors were used to investigate the differences in prestress losses and temperature gradients in a concrete deck bulb tee girder bridge. The Millville Bridge was built as an access point to the Ridgeline High School in Millville, Utah. The bridge was built in 2016 and presently supports...

 

Precast/prestressed double tee bridge girders are widely used for accelerated bridge construction on local roads in South Dakota. A common issue among existing double tee bridges in South Dakota is the rapid deterioration of longitudinal joints (shear keyways) between adjacent girders. Deteriorated joints...

 

The ultimate objective of this project was to develop widely accepted recommendations on self-consolidating concrete (SCC) mixture design for its use in WisDOT bridge projects. This project investigated the effects of material constituents on the material properties of trial SCC mixtures made from precasters...

 
1 2 Next Page
NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu