4 report(s) found with work zone traffic control in the keywords field
1 - 4 of 4
 

This study evaluates the impact of proposed replacement on the travelers in Summit County. The purpose of this research is to provide UDOT an estimation of possible delay costs due to congested traffic resulting from the proposed work zone scenarios. The VISSIM micro-simulation tool is used to build...

The impetus of this research is to meet the growing need for accurate and practical methods to support traffic analysis in work zones. This research examines the application of two classes of traffic analysis models, macroscopic sketch analysis and microscopic traffic simulation, to work zones. The research...

Traffic control alternatives associated with reconstruction projects on a rural interstate have been investigated in this research. Slab replacement projects, milling/resurfacing projects, and traffic controls in the vicinity of interstate ramps were analyzed. The recommendations obtained from a national...

Appendix for MPC-98-98A Volume 1. Traffic control alternatives associated with reconstruction projects on a rural interstate have been investigated in this research. Slab replacement projects, milling/resurfacing projects, and traffic controls in the vicinity of interstate ramps were analyzed. The...