Home Skip to main content

MPC Research Reports
Filter by Keyword

7 report(s) found with rehabilitation (maintenance) in the keywords field
1 - 7 of 7
 

Reinforced concrete bridge wall piers constructed using older codes perform inadequately during strong earthquakes; deficiencies include short reinforcement lap splices, insufficient steel reinforcement ratios in the longitudinal and transverse direction, and inadequate seismic detailing. Three half-scale...

 

This report presents a research program studying the grooved bonding schemes of composite sheets (carbon fiber reinforced polymer, CFRP) for rehabilitating concrete members. The first phase of the research presents the efficacy of functional periodicity on controlling the occurrence of interfacial failure...

 

Precast prestressed double-tee girders are common on county bridges in South Dakota because of the ease of construction, short construction time, and low cost. However, the longitudinal joints of these bridges are rapidly deteriorating, imposing girder replacement after only 45 years of service. Currently...

 

Highway project selection and scheduling are traditionally treated as two separate problems in the literature. It is critical to investigate how to select and schedule M&R projects in a way that can maximize their benefit or effectiveness while minimizing the traffic impacts of work zones across project...

 

A study was conducted to investigate implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time and interruption to traffic. The main objective of this...

 

The objective of this project is to find effective configurations for using buckling restrained braces (BRBs) in both skewed and curved bridges for reducing the effects of strong earthquakes. Verification is performed by numerical simulation using analytical models of existing bridges when BRBs are implemented...

 

The overall project is to demonstrate the effectiveness of shear spiking (technique already developed through a previous project). Many timber railroad bridges are deficient but it is too costly to replace them; hence, inexpensive repair techniques are needed. The proposed project will provide the necessary...

 
NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu