Home Skip to main content

Research Reports
Filter by Keyword

2 report(s) found with defects in the keywords field
1 - 2 of 2
 

For this study, eight full-size railroad bridge timber stringers were intentionally damaged by saw cuts, to mimic deterioration, after which they were strengthened through the process of shear spiking. The stringers were then durability loaded up to 25,000 cycles after which the majority of the sample...

 

Six major railroads provided the Transportation Technology Center Inc. (TTCI) with defective rail that had been removed from service. The rail, which contained a variety of defects, was placed into a gauntlet track at the Transportation Technology Center (TTC). This paper is the assessment of those six...

 
NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu