Home Skip to main content

MPC Research Reports
Filter by Keyword

5 report(s) found with computer aided design in the keywords field
1 - 5 of 5
 

To date, BIM (Building Information Modeling) is not widely utilized in infrastructure asset management. Benefits achieved through implementation in vertical construction, however, suggest that BIM represents significant opportunity for gains in process, material, and economic efficiency throughout infrastructure...

 

Often in traditional design procedures, a designer sketches results which are based on computer applications and transmits this information via hardcopy to a drafter, who reenters it into a CAD system. The inefficiencies are clear and an obvious opportunity exists for productive gain. Recent work by...

 

This documentation includes detailed information on each subroutine used to draw the entities supported by UWGRAPH. These descriptions include the definitions of the arguments, an example of the subroutine usage, and a graphical illustration of the arguments. Compilation instructions are included for...

 

This study was initiated by the Bridge Branch of the Wyoming Transportation Department to provide direction in optimizing CAD usage. Critical issues in managing computing resources in a design operation are staffing, maintaining, and financing a highly dynamic system. Managing such a system properly...

 

Often, a traditional design procedure is used wherein a designer sketches results which are based on computer applications and transmits this information via hard copy to a drafter, who re-enters it into a CAD system. The inefficiencies are clear and an obvious opportunity exists for productive gain....

 
NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu