Home Skip to main content

ATAC Research Reports
Filter by Keyword

1 report(s) found with benefit cost analysis in the keywords field
1 - 1 of 1

The North Dakota Department of Transportation (NDDOT) has installed two fixed automated spray technology (FAST) systems. One system is installed at the Interstate 29 (I-29) Buxton Bridge (near Buxton, ND), while the second installation is at the Interstate 94 (I-94) Red River Bridge between Fargo, ND...

 
NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-8058ndsu.ugpti@ndsu.edu