Upper Great Plains Transportation Institute

Research Reports
Report Details

Title:
User Cost Analysis of Main Ave. Reconstruction in Fargo
Authors:
Publication Date:
Oct 2003
Type:
Research Report

Abstract

ATAC assisted the NDDOT in estimating user costs for the Main Avenue construction project in Fargo. Main Ave. in Fargo is a major arterial which carries close to 30,000 vehicles per day. Therefore, the Main Ave construction is expected to have significant impacts on traffic in the metropolitan area. The analysis utilized the Fargo-Moorhead Council of Government's (FM-COG) travel demand model to estimate changes in travel time for a modified network to reflect the speed and lane configurations in place during the construction.