Project Details
US 85 / ND 200 Spot Speed Studies
Principal Investigators:
Kshitij Sharma
End Date:
August 2021
Status:
Completed
Abstract
NDDOT requested the Advanced Traffic Analysis Center (ATAC) to conduct before-and-after spot speed studies at three locations along US 85/ND 200. One study was conducted at each of the locations with both northbound/westbound and southbound/eastbound directions of travel observed. Two years later, another study was conducted in the same manner.