Home Skip to main content

MPC Research Reports
Filter by Keyword

3 report(s) found with time duration in the keywords field
1 - 3 of 3
 

Highway project selection and scheduling are traditionally treated as two separate problems in the literature. It is critical to investigate how to select and schedule M&R projects in a way that can maximize their benefit or effectiveness while minimizing the traffic impacts of work zones across project...

 
Inclement Weather Signal Timings (Jul 2000, MPC-01-120)

This study examines signal timing in inclement weather conditions. With the completion of the Utah DOT's Advanced Traffic Management System (ATMS), UDOT will have the capability to change signal timing plans from a central location by communicating with each controller through fiber optic technology....

 

This report describes a study jointly conducted by the University of Wyoming and the Wyoming Department of Transportation to examine the effect of construction Profilograph Index (PI) values on long-term roughness measurements of concrete pavements. The objectives of this study were to determine if increased...

 
NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu