MPC Research Reports
Report Details
Abstract
Six major railroads provided the Transportation Technology Center Inc. (TTCI) with defective rail that had been removed from service. The rail, which contained a variety of defects, was placed into a gauntlet track at the Transportation Technology Center (TTC). This paper is the assessment of those six evaluations at the Railflaw Detection Test Facility (RDTF).