ATAC Project Details
Grand Forks Continuing Traffic Data Collection Support
Abstract
Recent reconstruction of the Grand Forks transportation network included upgrades of some of the older models of cameras. The MPO intended to: 1) continue utilizing the reconstructed intersections for traffic data collection; 2) utilize available API commands to download traffic data; and 3) minimize data loss and disruptions
As part of this study, 9 intersections with 36 cameras were to be configured/re-configured to collect traffic volumes and speeds.
Project Deliverables