User Cost Analysis of I-29 Reconstruction: Fargo, ND

End Date:
January 2001
Status:
Completed
Keywords:
construction, cost estimating, impacts, signalized intersections, traffic simulation

Abstract

ATAC conducted a detailed analysis of potential impacts of the I-29 construction activities in Fargo. The analyses included estimating user costs due to the construction along the corridor as well as possible alternative routes. A network consisting of I-29 as well as alternative routes was constructed in the VISSIM traffic simulation model. The network contained over 60 signalized intersections. Traffic volumes were varied based on ranges of traffic diversions from I-29.

Final Report

Completed Report: Download Report (PDF, 485K)