Home Skip to main content

Research Reports
Filter by Keyword

19 report(s) found with travel time in the keywords field
11 - 19 of 19 Previous Page 1 2
   

The goal of this study is to evaluate light rail priority strategies along the 400 S / 500 S corridor in Salt Lake County through analyzing benefits and impacts of the priority on transit and vehicular traffic through microsimulation. The results show that the existing priority strategies have no impacts...

With ever-increasing traffic demand and price of fossil fuels public transit becomes more popular transportation mode than ever before, especially in the fast growing regions such as Salt Lake City Metropolitan Region. Wasatch Front Regional Council (WFRC) (a local Metropolitan Planning Organization)...

Earthquakes damage transportation infrastructure. In addition to replacement and repair costs for damage to transportation structures, large earthquakes can increase time delays resulting from a network component's loss of function. Damage to the network can severely disrupt traffic flows for several...

Innovative lane management offers the opportunity to levy fees for the premium road space. Express Lanes in Utah offer road users reduced journey times for a fee. The Utah Department of Transportation (UDOT) has converted the High Occupancy-Vehicle (HOV) lanes on Interstate 15 (I-15) from 600 North Street...

In 2005, the Utah Department of Transportation (UDOT) installed the Sydney Coordinated Adaptive Traffic System (SCATS) in Park City, Utah, on its network of 14 signalized intersections. A field evaluation compared previous time-of-day actuated-coordinated signal timings with those dynamically computed...

This research evaluates the effectiveness of the future Utah Department of Transportation (UDOT) adaptive signal control system on the arterial street network in Park City, Utah, that experiences both everyday and unpredictable changes in traffic flow. This report contains the planned methodology for...

This study reports on the performance of the extended HOV lines. Vehicle volume, average vehicle occupancy (AVO), modal split, person throughput, and violation rate were collected manually. Travel time and speed data were collected using the floating car method and global positioning system (GPS) software....

This paper reports on a two-year study evaluating HOV lane performance. The analysis assesses the freeway operations before the HOV lanes opened with continued assessment throughout the first year of operation. It looks at automatic data from traffic monitoring stations and manual data from roadside...

This study provides a theoretical evaluation of Transit Signal Priority (TSP) strategies in small-medium size areas to alleviate missed connections, enhance service, and attract more transit riders. Several scenarios are evaluated, involving two TSP strategies; existing and reduced bus headways; and...

Previous Page 1 2
NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu