Upper Great Plains Transportation Institute

Research Reports
Filter by Keyword

27 report(s) found with traffic control in the keywords field
21 - 27 of 27 Previous Page 1 2 3
   
Detector Technology Evaluation (Nov 2003, MPC-03-154)

This paper evaluates detector technologies under a variety of criteria and provides user guidelines for detector technology selection. Information for the project came from applications of detector technologies, detector technology development, user manuals about specific detector devices, detector field-testing...

Adaptive Signal Control II (Jan 2003, MPC-03-141)

Increasing traffic congestion is a constant source of frustration, time loss, and expense to users and managers of transportation systems. Cities, counties, and state transportation agencies are persistently searching for ways to mitigate urban traffic congestion, while minimizing costs and maintenance...

This research focuses on real-time congestion monitoring, a unique direction, as most other cities focus solely on freeway operations as they are easier to monitor. Once surface street congestion is monitored successfully, recurring problematic locations can be identified, and solutions can be developed...

This study was conducted due to concerns related to pedestrian/vehicle conflicts in the area of the intersection of University Dr. and Administration Ave. The intersection is currently controlled by stop signs on the minor approaches (Administration Ave., the NDSU Station Post Office, and the Alumni...

The 12th Ave. N. corridor in Fargo, ND, serves many industrial, manufacturing, and warehouse facilities, as well as many dwelling units and North Dakota State University (NDSU). The corridor is also heavily used for special events at the Fargodome and NDSU. Currently, a large number of these motorists...

Traffic control alternatives associated with reconstruction projects on a rural interstate have been investigated in this research. Slab replacement projects, milling/resurfacing projects, and traffic controls in the vicinity of interstate ramps were analyzed. The recommendations obtained from a national...

Appendix for MPC-98-98A Volume 1. Traffic control alternatives associated with reconstruction projects on a rural interstate have been investigated in this research. Slab replacement projects, milling/resurfacing projects, and traffic controls in the vicinity of interstate ramps were analyzed. The...

Previous Page 1 2 3