Home Skip to main content

Research Reports
Filter by Keyword

72 report(s) found with tests in the keywords field
11 - 20 of 72 Previous Page 1 2 3 4 5 6 ...8 Next Page
   

The Rocky Mountain Region has experienced considerable difficulty because of alkali-silica reaction (ASR) in concrete construction. Wyoming Department of Transportation was successful in using recycled concrete aggregate (RCA) on Interstate I-80 with limited ASR damage. Reusing concrete from demolition...

 

The 24/7 Sobriety Program is an intervention strategy mandating that alcohol-impaired driving offenders remain sober as a condition of bond or pre-trial release. The goal is to monitor the most at-risk offenders in North Dakota and require that these individuals remain sober in order to keep roadways...

 

Longitudinal joints in Portland Cement Concrete (PCC) pavement slabs require tie (dowel) bars to control joint opening resulting from thermal stresses. Inspections of PCC pavements by the South Dakota Department of Transportation using ground penetrating radar revealed that it is common for tie bars...

 

Calcium sulfoaluminate (CSA) cement was used to cast a prestressed voided deck slab bridge girder. The rapid-set properties of CSA cement allowed the initial concrete strength to reach the required 4300 psi needed in order to cut the prestressing strands 6.5 hours after casting. Prestress losses were...

 

Accurate prediction of the shear strength of swelling clays is critical for the design of infrastructure. Damage caused to U.S. infrastructure by swelling clays is estimated to be about $13 billion per year. Overestimation of strength can lead to failures, and underestimation can lead to an increase...

 

Reinforced concrete bridge wall piers constructed using older codes perform inadequately during strong earthquakes; deficiencies include short reinforcement lap splices, insufficient steel reinforcement ratios in the longitudinal and transverse direction, and inadequate seismic detailing. Three half-scale...

 

Precast prestressed double-tee girders are common on county bridges in South Dakota because of the ease of construction, short construction time, and low cost. However, the longitudinal joints of these bridges are rapidly deteriorating, imposing girder replacement after only 45 years of service. Currently...

 

The most common type of bridge on South Dakota local roads is a precast prestressed double-tee (DT) girder bridge. More than 700 DT bridges are currently in-service in South Dakota. Structural detailing, aging, traffic volume, and environmental conditions affect structural performance, integrity, and...

 

This study evaluates the seismic performance of circular concrete-filled tube (CCFT) columns in accelerated bridge construction (ABC) projects. CCFT components are considered of interest for bridges subjected to seismic forces due to their efficient structural behavior under combined axial and bending...

 

To improve the pavement design and construction in Wyoming, the Wyoming Department of Transportation (WYDOT) is adopting the Mechanistic-Empirical Pavement Design Guide (MEPDG). A full implementation of MEPDG requires the characterization of local crushed base materials. In this research, laboratory...

 
Previous Page 1 2 3 4 5 6 ...8 Next Page
NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu