MPC Research Reports Filter by Keyword4 report(s) found with state of the practice in the keywords field 1 - 4 of 4 Due to the short construction season in Wyoming, contractors must complete many transportation projects on a tight schedule. Unfortunately, contractors often cannot create accurate schedules considering logical work ordering, reasonable productivity, and weather events. Inaccurate baseline schedules... Over the last two decades many researchers have focused on providing new ideas and frameworks that can help improve conventional bridge inspection practices; however, little guidance is provided for implementing these new ideas in practice. This, along with resistance to change and complexity of the... The South Dakota Department of Transportation (SDDOT) currently has a Finite-Element Surface-Water Modeling System for Two-Dimensional Flow (FESWMS-2DH) and Research Management Associates 2 (RMA2) Both programs have the capability to model two-dimensional (2D) flow around structures. The department must... To date, BIM (Building Information Modeling) is not widely utilized in infrastructure asset management. Benefits achieved through implementation in vertical construction, however, suggest that BIM represents significant opportunity for gains in process, material, and economic efficiency throughout infrastructure...
|