Due to the short construction season in Wyoming, contractors must complete many transportation projects on a tight schedule. Unfortunately, contractors often cannot create accurate schedules considering logical work ordering, reasonable productivity, and weather events. Inaccurate baseline schedules...

Highway project selection and scheduling are traditionally treated as two separate problems in the literature. It is critical to investigate how to select and schedule M&R projects in a way that can maximize their benefit or effectiveness while minimizing the traffic impacts of work zones across project...

The current legally required two-year inspection interval for most bridges is not an efficient system for conducting inspections, because many bridges do not require inspections this frequently, while others would benefit from more frequent monitoring. The research presented herein is based on the premise...

In this paper, findings from a national survey on technology use by agencies providing transit service to rural areas are presented. The survey collected data on agency use of information and communications technologies, transit-specific technology, as well as characteristics of its manager. The survey...

This report describes a framework of software extensions that could be added to modest-priced scheduling software to improve the scheduling effectiveness for small to medium size paratransit agencies. The operations at nine paratransit agencies at various locations around the country were observed and...