Home Skip to main content

Research Reports
Filter by Keyword

53 report(s) found with construction in the keywords field
21 - 30 of 53 Previous Page 1 2 3 4 5 6 Next Page
   

Millions of cubic yards of concrete and steel used to support the U.S infrastructure may result in a significant negative impact on the environment. CO2 released by construction processes, as well as material production, is taking a substantial toll on the environment. This study seeks to develop a system...

Perception-reaction times (PRT) and deceleration rates are critical components in the design of highways and streets. This research has several objectives, including 1) evaluate differences in PRT and deceleration rates between crash and near-crash events, 2) assess the correlation between PRT and deceleration...

Precast/prestressed double tee bridge girders are widely used for accelerated bridge construction on local roads in South Dakota. A common issue among existing double tee bridges in South Dakota is the rapid deterioration of longitudinal joints (shear keyways) between adjacent girders. Deteriorated joints...

Expanded Polystyrene (EPS) geofoam is a super-lightweight material used in various transportation engineering applications. It has been particularly successful as an ultra-lightweight alternative to earthen, geosynthetic reinforced soil (GRS), and mechanically-stabilized earth (MSE) embankment systems...

The objectives of this study were to assess geotechnical properties of mine waste amended with fly ash and evaluate reuse of fly ash amended mine waste as road construction material. Three types of fly ash and one type of cement were used as cementitious binder. Natural and synthetic (i.e., laboratory...

A study was conducted to investigate implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time and interruption to traffic. The main objective of this...

Connections between precast concrete elements must be able to withstand significant stresses and deformations in earthquakes. The grouted splice sleeve (GSS) connector is being considered for connecting footing, column, and cap beam elements in accelerated bridge construction (ABC). There are limited...

Grouted Splice Sleeve (GSS) connectors are being considered for connecting bridge columns, footings, and pier caps in Accelerated Bridge Construction (ABC). A repair technique for precast reinforced concrete bridge column-to-footing and column-to-pier cap joints constructed with GSS connectors has been...

Conventional test methods for roadway compaction cover less than 1% of roadway; whereas, intelligent compaction (IC) offers a method to measure 100% of a roadway. IC offers the ability to increase compaction uniformity of soils and asphalt pavements, which leads to decreased maintenance costs and an...

To date, BIM (Building Information Modeling) is not widely utilized in infrastructure asset management. Benefits achieved through implementation in vertical construction, however, suggest that BIM represents significant opportunity for gains in process, material, and economic efficiency throughout infrastructure...

Previous Page 1 2 3 4 5 6 Next Page
NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu