Home Skip to main content

MPC Research Reports
Filter by Keyword

71 report(s) found with bridges in the keywords field
11 - 20 of 71 Previous Page 1 2 3 4 5 6 ...8 Next Page
   

The use of deicing salts on highway bridges has decreased the service life of bridge decks due to the accelerated corrosion of the steel reinforcement. The use of Glass Fiber Reinforced Polymer (GFRP) in bridge decks as a means of corrosion-mitigation has been met with some success; however, GFRP is...

 

Calcium sulfoaluminate (CSA) cement was used to cast a prestressed voided deck slab bridge girder. The rapid-set properties of CSA cement allowed the initial concrete strength to reach the required 4300 psi needed in order to cut the prestressing strands 6.5 hours after casting. Prestress losses were...

 

This report presents the feasibility of a novel anchor system that mitigates the end-peeling of carbon fiber reinforced polymer (CFRP) sheets used for strengthening reinforced concrete beams. Contrary to conventional anchoring methods, CFRP sheets are embedded inside the pre-grooved concrete and covered...

 

Reinforced concrete bridge wall piers constructed using older codes perform inadequately during strong earthquakes; deficiencies include short reinforcement lap splices, insufficient steel reinforcement ratios in the longitudinal and transverse direction, and inadequate seismic detailing. Three half-scale...

 

This report presents a research program studying the grooved bonding schemes of composite sheets (carbon fiber reinforced polymer, CFRP) for rehabilitating concrete members. The first phase of the research presents the efficacy of functional periodicity on controlling the occurrence of interfacial failure...

 

Due to the current limitations on seismic forecasting, there is a high chance that a considerable number of vehicles would remain on a bridge when an earthquake occurs. In traditional seismic analyses, traffic loads were often ignored. Existing mode-based bridge-traffic interaction analysis usually cannot...

 

Precast prestressed double-tee girders are common on county bridges in South Dakota because of the ease of construction, short construction time, and low cost. However, the longitudinal joints of these bridges are rapidly deteriorating, imposing girder replacement after only 45 years of service. Currently...

 

Long-span bridges support a large amount of traffic every day. Even when an earthquake strikes, a long-span bridge often still has many vehicles present due to the low predictability of earthquake events. To study the seismic performance of bridge and traffic systems, a new full-response prediction methodology...

 

The most common type of bridge on South Dakota local roads is a precast prestressed double-tee (DT) girder bridge. More than 700 DT bridges are currently in-service in South Dakota. Structural detailing, aging, traffic volume, and environmental conditions affect structural performance, integrity, and...

 

The South Dakota Department of Transportation (SDDOT) allows the use of precast double-tee bridges in counties because they are economical and fast in construction. Alternative durable prefabricated bridge systems are needed to provide more options to local governments. The present study was carried...

 
Previous Page 1 2 3 4 5 6 ...8 Next Page
NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu