Recently, significant advances have been made in the development of rapid setting cementitious materials for partial-depth bridge deck repair. The rapid set times of these materials allow for traffic to be re-opened onto the bridge deck in several hours versus days once the material has been placed....

Polymer concrete (PC) has found increasing use in construction over the last few decades. One common use of this material is as an overlay material on bridges and highways. This use can be attributed to some advantages of this material such as its high bond strength with substrate concrete, short curing...

In several states, bridge deck delamination of reinforced concrete bridge decks built with partial depth precast concrete panels and cast-in-place concrete has been observed. The partial depth precast concrete panels are typically prestressed. Recently, one such failure was observed in Utah. There is...

The condition of concrete on bridge decks is one of the most costly parts of Wyoming Department of Transportation's budget and the cost of maintenance can result in inadequate roads or costly premature repairs. This proposal evaluates critical factors relating to early age shrinkage and proposes combining...

Cross Laminated Timber (CLT) has only recently garnered attention as a new construction material in the United States. Despite being introduced in Europe nearly 20 years ago, CLT is still not used widely in North America. One primarily reason is because CLT is not yet recognized as a structural system...

The use of deicing salts on highway bridges has decreased the service life of bridge decks due to the accelerated corrosion of the steel reinforcement. The use of Glass Fiber Reinforced Polymer (GFRP) in bridge decks as a means of corrosion-mitigation has been met with some success; however, GFRP is...

The South Dakota Department of Transportation (SDDOT) allows the use of precast double-tee bridges in counties because they are economical and fast in construction. Alternative durable prefabricated bridge systems are needed to provide more options to local governments. The present study was carried...

For this research, sensors were used to investigate the differences in prestress losses and temperature gradients in a concrete deck bulb tee girder bridge. The Millville Bridge was built as an access point to the Ridgeline High School in Millville, Utah. The bridge was built in 2016 and presently supports...

The current legally required two-year inspection interval for most bridges is not an efficient system for conducting inspections, because many bridges do not require inspections this frequently, while others would benefit from more frequent monitoring. The research presented herein is based on the premise...

Concrete bridge decks are directly exposed to daily traffic loads and may experience some surface cracking caused by excessive stress or fatigue accumulation, which requires repair or replacement. Among typical bridges in North America, bridge decks are considered the most expensive component to construct...