22 report(s) found with bridge construction in the keywords field
11 - 20 of 22 Previous Page 1 2 3 Next Page
   

This study evaluates the seismic performance of circular concrete-filled tube (CCFT) columns in accelerated bridge construction (ABC) projects. CCFT components are considered of interest for bridges subjected to seismic forces due to their efficient structural behavior under combined axial and bending...

The South Dakota Department of Transportation (SDDOT) allows the use of precast double-tee bridges in counties because they are economical and fast in construction. Alternative durable prefabricated bridge systems are needed to provide more options to local governments. The present study was carried...

Compared with conventional lap splicing, mechanical splicing is an alternative method of connecting bars in reinforced concrete (RC) structures, and is used mainly to reduce bar congestion in joints. Recently, mechanical bar splices, which are also referred to as bar couplers, have been used in laboratories...

Millions of cubic yards of concrete and steel used to support the U.S infrastructure may result in a significant negative impact on the environment. CO2 released by construction processes, as well as material production, is taking a substantial toll on the environment. This study seeks to develop a system...

Precast/prestressed double tee bridge girders are widely used for accelerated bridge construction on local roads in South Dakota. A common issue among existing double tee bridges in South Dakota is the rapid deterioration of longitudinal joints (shear keyways) between adjacent girders. Deteriorated joints...

Expanded Polystyrene (EPS) geofoam is a super-lightweight material used in various transportation engineering applications. It has been particularly successful as an ultra-lightweight alternative to earthen, geosynthetic reinforced soil (GRS), and mechanically-stabilized earth (MSE) embankment systems...

A study was conducted to investigate implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time and interruption to traffic. The main objective of this...

Connections between precast concrete elements must be able to withstand significant stresses and deformations in earthquakes. The grouted splice sleeve (GSS) connector is being considered for connecting footing, column, and cap beam elements in accelerated bridge construction (ABC). There are limited...

Grouted Splice Sleeve (GSS) connectors are being considered for connecting bridge columns, footings, and pier caps in Accelerated Bridge Construction (ABC). A repair technique for precast reinforced concrete bridge column-to-footing and column-to-pier cap joints constructed with GSS connectors has been...

To date, BIM (Building Information Modeling) is not widely utilized in infrastructure asset management. Benefits achieved through implementation in vertical construction, however, suggest that BIM represents significant opportunity for gains in process, material, and economic efficiency throughout infrastructure...