Home Skip to main content

ATAC
Project Details

Title:User Cost Analysis of Main Ave. Reconstruction in Fargo
End Date:October 2003
Status:Completed

Abstract

ATAC assisted the NDDOT in estimating user costs for the Main Avenue construction project in Fargo. Main Ave. in Fargo is a major arterial which carries close to 30,000 vehicles per day. Therefore, the Main Ave construction is expected to have significant impacts on traffic in the metropolitan area. The analysis utilized the Fargo-Moorhead Council of Government's (FM-COG) travel demand model to estimate changes in travel time for a modified network to reflect the speed and lane configurations in place during the construction.

Keywords: User Costs, Construction, Fargo

Final Report

Download Technical Memo (PDF, 46K)

NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-8058ndsu.ugpti@ndsu.edu