Home Skip to main content

ATAC
Project Details

Title:I-94 Exit 161 Operational Analysis, Bismarck, ND
End Date:November 2009
Status:Completed

Abstract

Operational deficiencies along Centennial Road/Bismarck Expressway near I-94 (Bismarck, ND) have been developing in recent years. ATAC assisted the NDDOT in assessing the operational performance of the existing conditions and future planning horizons with various geometric and traffic control configurations. The major components of the analysis included determining the morning and afternoon peak-hour conditions for the 2009, 2024, 2035, and 2059 planning horizons. Key measures of effectiveness (MOE) from the analysis included network delay, intersection level of service (LOS), and queue length. The analysis recommended several short-term and long-term improvements to the corridor for improving traffic flow.

Keywords: Bismarck, travel demand model, traffic analysis, Synchro

Final Report

Download Report (PDF, 9106K)

NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-8058ndsu.ugpti@ndsu.edu