Home Skip to main content

ATAC
Project Details

Title:Tri-Level Traffic Operations Study: Fargo, ND
End Date:May 2008
Status:Completed

Abstract

Operational deficiencies along I-94 have been developing in recent years within the Fargo-Moorhead metropolitan area. One such area is the section of I-94 between I-29 and 25th St., which experiences congestion during the afternoon peak period. ATAC assisted the NDDOT in assessing the operational performance of the existing conditions and various geometric designs between the I-94 & I-29 Interchange and the I-94 & 25th St. Interchange. The major components of the analysis included determining the vehicle paths through the study area and simulating various design alternatives for both existing and projected 2030 conditions. Key measures of effectiveness (MOE) from the simulation analysis were compared among the simulation scenarios, which provided insight for selecting a more appropriate design alternative.

Keywords: Fargo, traffic simulation, VISSIM

Final Report

Download Report (PDF, 5428K)

NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-8058ndsu.ugpti@ndsu.edu