Home Skip to main content

ATAC
Project Details

Title:Area Train Detection and Traffic Control System Evaluation: Moorhead, MN
End Date:October 2003
Status:Completed

Abstract

ATAC conducted a comprehensive evaluation of the Moorhead Area Train Detection and Traffic Control System for the Minnesota Department of Transportation. The project implemented ITS technologies of non-intrusive train detection and advanced traffic control to alleviate the impacts of trains blocking several rail crossings in the Moorhead area. The evaluation measured the impacts of the project on traffic delays and travel time, and examined the accuracy of the train detection system. ATAC's Traffic Data Collection System with its Autoscope machine vision processing was used for the data collection at several major intersections in the study area.

Keywords: ITS Evaluation, Highway-Rail-Intersections, Moorhead

Final Report

Completed Report: Download Report (PDF, 1288K)

NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-8058ndsu.ugpti@ndsu.edu