08.03.2021 | 203-P__ EMBANKMENT REMOVAL: Remove the embankment in its entirety at locations adjacent to newly installed culverts and where the embankment extends beyond the right of way after completion of the culvert installation. Protect culverts during embankment removal to ensure no silt enters the pipe. Consider adding utility avoidance language if applicable. In areas not adjacent to culvert pipes, remove the embankment to an elevation one foot below the existing water elevation after placing riprap. Do not push the embankment into the water so it is below the water elevation. The removed embankment may be incorporated in other areas of the project. The Engineer will not pay for removed embankment material incorporated into other areas of the project a second time. The Engineer will only pay for the borrow material removed from the borrow site. All specifications of the new placement site apply to this material. Dispose of all removed embankment, not incorporated into the project, outside the highway right of way in accordance with Section 107.17. If the removed embankment is disposed of in a borrow site, coordinate with the Engineer to cross-section the borrow site prior to disposal. Include all costs for placement, dewatering, removal, and disposal of the removed embankment in the price bid for "Borrow-Excavation". Typically used in conjunction with the KEYWAY/BERM note. |
08.03.2021 | 203-P__ KEYWAY/BERM: Construct a keyway/berm in areas where the foreslope extends into the water at locations shown in the plans. Construct the keyway/berm as shown in the plans. Include all costs of material, dewatering, and construction in the price bid for "Borrow-Excavation". The estimated quantity of borrow needed to construct the keyway/berm is included in the quantities for "Borrow-Excavation". Typically used where a keyway/berm is utilized for installation of rip rap (per the water depth criteria defined in the Design Manual) on grade raise projects or grade widening projects that restore clear zones due to rising water levels. A detail drawing, titled "Riprap Placement at Grade Raises", illustrating the work requirements in this note can be found on the Plan Preparation Guide website. |
Plan Notes (Design):
- Section 100
- Section 200
- Section 300
- Section 400
- Section 500
- Section 600
- Section 700
- Section 800
- Section 900
Download Template
The following template can be used for standard and plan notes.
- Design Notes (DOCM, 70K)