Home Skip to main content

Project Details

Title:User Cost Analysis of I-29 Reconstruction: Fargo, ND
End Date:January 2001
Status:Completed
Keywords:construction, cost estimating, impacts, signalized intersections, traffic simulation

Abstract

ATAC conducted a detailed analysis of potential impacts of the I-29 construction activities in Fargo. The analyses included estimating user costs due to the construction along the corridor as well as possible alternative routes. A network consisting of I-29 as well as alternative routes was constructed in the VISSIM traffic simulation model. The network contained over 60 signalized intersections. Traffic volumes were varied based on ranges of traffic diversions from I-29.

Final Report

Completed Report: Download Report (PDF, 485K)

NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu